Portfolio hero

Our Work

Projects & Case Studies

Real projects, real numbers, real families. Explore how Nextstar Spaces has transformed backyards, lots, and communities across California.

200+

Units Completed

9–14 mo

Average Timeline

$270K–$4.2M

Project Range

100%

On-Budget Rate

Backyard ADU — Woodland Hills
Homeowner ADUWoodland Hills, CA

Backyard ADU — Woodland Hills

A growing family needed a flexible living solution — a comfortable space for aging parents that could later serve as rental income. The 8,500 sq ft lot had just enough room, but required careful site engineering due to a sloped grade.

640 sq ft9 months
View case study
Multifamily ADU Complex — San Jose
MultifamilySan Jose, CA

Multifamily ADU Complex — San Jose

A developer-owner with a 0.6-acre lot wanted to maximize density under California's new ADU laws. City zoning allowed up to 8 attached ADU units. The challenge: deliver all 8 units under budget with minimal disruption to the existing four-plex on site.

4,800 sq ft14 months
View case study
Primary Home Fire Rebuild — Altadena
Fire RebuildAltadena, CA

Primary Home Fire Rebuild — Altadena

The Rodriguez family lost their 1960s ranch home in the Eaton Fire. Insurance covered the footprint rebuild, but the family wanted modern fire-safe construction, upgraded layout, and a timeline fast enough to avoid a second year in temporary housing.

2,100 sq ft11 months
View case study
Detached ADU — Danville
Homeowner ADUDanville, CA

Detached ADU — Danville

A homeowner in Danville's foothills wanted a premium detached ADU for long-term Airbnb rental while maintaining privacy from the main house. The site had a 4-foot elevation change requiring engineered footings.

750 sq ft10 months
View case study
Developer Build — 12-Unit Community
DeveloperRiverside County, CA

Developer Build — 12-Unit Community

A regional developer needed 12 for-sale homes delivered faster than traditional stick-built construction to beat a rising interest rate environment. The 3.2-acre infill site required significant grading, and the municipality demanded architectural variety across the streetscape.

11,400 sq ft18 months
View case study

Ready to start your project?

Get a free feasibility study and see what's possible on your property. No obligation.

Talk with Us